Versions Compared
Key
- This line was added.
- This line was removed.
- Formatting was changed.
Manually Adding a Violation to an Evaluation
To add a Violationviolation, click the Evaulations tab and select an existing evaluation or create a new evaluation.
Once an evaluation is created or an exisitng evaluation is selected, a violation can be manually created.Once a new evaluation is created or an exisiting existing evaluation is selected, a violation can be manually created. Once Open the evaluation is created, and navigate to the Violations tab.
Image RemovedImage AddedOnce there, click the Add New Violation button. Once the violation is created here, it can then be linked to compliance actions, etc.
Image RemovedImage AddedA page will show appear that allows the user User to configure the violation. Only the violation type is required.
Image RemovedImage AddedField | Description |
---|---|
Program Area | The program area to which the violation relates. |
Violation Category | The category of the violation. Categories are specific to one or more program areas. |
*Violation Type | The type of violation. A violation type relates to one or more violation categories. |
Parameter | Indicates if the violation relates to a specific sampling parameter or analyte. This field is searchable by entering search text. |
Start Date | The date the violation began. This can indicate the date the violation condition actually began, or the date it was first identified. It depends on how the agency chooses to use this field. |
Non-Compliance End Date | The date the violation condition ended. This field can be used for different purposes depending on how an agency chooses to use it. For example, it could be used to indicate the date the violation condition was addressed via a compliance or enforcement action. |
Continuous Period | Indicates that the violation condition occurred on an ongoing basis between the start and end date. |
Is Significant Non-compliance | Indicates whether or not the violation is significant. Use of this checkbox is at the discretion of individual agency and/or program. Checking this box does not affect any system behavior. |
Creating a Compliance Action
The User can Indicate which violation(s) to include in the notice and then click Create Compliance Action in the top right corner.
Image AddedA page will show that allows the user to input the compliance and enforcement details. Select the Violation type, then click Save.
Image AddedCreating a Follow Up Evaluation
Check the box next to the violation, then in the top right corner, click Create Follow Up Evaluation.
Image AddedThis will create another inspection the user can schedule. The user will then input the schedule date and click save. This will create a new follow up inspection for the scheduled date.
Image AddedOn this Page
Table of Contents |
---|
Related Content